Home / Building services / McLaren to repurpose art deco landmark
CGI showing how the refurbished building will look

McLaren to repurpose art deco landmark

Publica Properties Establishment has appointed McLaren Construction to carry out the £132 million refurbishment and extension of 318 Oxford Street, repurposing the House of Fraser department store as a 34,000 square metre mixed use development.

The project restores the art deco landmark, built in 1937 and occupied originally by DH Evans and then by the House of Fraser until it went into administration in August 2018. The building is badly damaged by ‘Regent Street disease’ and McLaren will be responsible for repairing the Portland stone façade, reinstating architectural features and completing the Chapel Place façade.

Reuse of a large proportion of the façade and structure significantly reduces the new building’s whole-life embodied carbon, while the installation of high-performance windows and centralised building services will reduce operational carbon emissions.

The structural design relocates 10 steel columns retrieved from the demolished 5th floor to the new 8th floor. The remaining 11 columns from the fifth floor have been transported across London to be re-used within another project by the same structural engineer working with a third-party contractor.

The new building replaces the department store with ground floor retail, including two new double-height entrances, and high quality office space, plus two restaurants and a gym with a swimming pool. This resilient mix of uses is intended to bring greater diversity to Oxford Street and helps to develop an evening economy.

The 6th and 7th floors, originally designed with low ceilings for back-of-house uses, will be reconstructed, with the addition of a new terrace. A new set-back 8th floor extension in lightweight construction is intended as a top-floor restaurant and has a terrace.

McLaren Construction’s Managing Director London & South, Darren Gill, commented: “More of these asset repurposing projects are coming through to the market. These are often familiar buildings in prominent locations. They present an opportunity to improve resilience through a variety of new uses – not just for the building, but for the area too.

“The construction industry will increasingly need the skills to repurpose historic buildings. It’s essential if we want to balance the creation of quality spaces with reduced carbon footprints. McLaren’s investment in this expertise is paying off with a raft of high profile cut and carve projects in central London.”

Commenting on behalf of Publica Properties Establishment, Project Development Manager, Joseph McNeil said: “The project has been a fantastic opportunity to work with McLaren Construction on a truly ‘retro-first’ approach, bringing this building back to life with the minimum whole-life embodied carbon impact.”

The project is McLaren’s latest contribution to the reinvention of Oxford Street, as landowners bring a greater mix of uses to the street and where the company is currently refurbishing the flagship Oxford Circus store at 214 Oxford Street.

About Sarah OBeirne

Leave a Reply

Your email address will not be published. Required fields are marked *

*