MONTH IN FM TO ADVERTISE IN MONTH IN FM PLEASE CONTACT
DANNY.GRANGE@KPMMEDIA.CO.UK OR CALL 01322 476811
EVERY SECOND COUNTS... HOW QUICKLY CAN
YOU ACCESS A DEFIBRILLATOR TO SAVE A LIFE?
Did you know that each minute of delay a er a
cardiac arrest, reduces the patients chance of
survival by 10 per cent?
Aero Healthcare, are the master distributors of the
most technically advanced defibrillators in the UK
and have supplied the largest roll out of Automated
External Defibrillators (AEDs) across the country.
As industry experts, Aero Healthcare provide the
hospitality sector with a complete solution for top
of the range defibrillators, coupled with experienced
ongoing support.
50 SEPTEMBER 2021
Selecting the correct
defibrillators for multiple
locations is complex.
Aero Healthcare’s
specialists pair
each unit’s location
and operating
environment with
the most suitable
defibrillator features,
to ensure
that the
device provided really is both fit for purpose and
quick to deploy.
The Arrhythmia Alliance state that “Sudden cardiac
arrest strikes without warning, regardless of age,
killing 100,000 Brits every year;” and the British Heart
Foundation attribute 84% of these as being outside
of a healthcare setting.
Oscar Palmer, Commercial Director of Aero
Healthcare UK explains: “Currently the UK is way
behind other countries when it comes to the
provision of defibrillators in public places. We
are delighted to see businesses recognising the
urgent need for correctly assessed defibrillator
requirements, and are proud to be enabling the
lifesaving change.”
Aero Healthcare’s longstanding partnership with
Stryker, the manufacturers of the
extensive HeartSine and LifePak
ranges, guarantees all needs can
be catered for. The LifePak CR2’s
superior technology, that allows
lifesaving shocks to be delivered
in more cases than any other
device, boasts a significantly
enhanced impedance range (skin
resistance range). This enables
the delivery of an e ective shock,
regardless of chest size, skin
tone, muscle build or age; all
key markers for every
defibrillator as they
analyse the need to
deliver, or not, a shock
to save a life.
https://solutions.aerohealthcare.co.uk/defibrillators/ sales@areohealthcare.co.uk 01403 790704
BESPOKE LIGHTING REFURBISHMENT MAKES
A STRONG STATEMENT AT ONE LONDON WALL
It's surprising to learn that even prestigious
and the ceiling mounted down lights, with metal
300 mm deep and when planted weighs 115k. Each is
o ice developments built in the 21st century now
halide lamps delivered ine icient and ine ective
suspended six meters above ground level, with a set of
require refurbishment. Whilst many still have
lighting whilst requiring
eight suspension wires."
visual impact, the experiences of those working
regular maintenance.
O ering greater energy
in these spaces may not be so positive which may
LSR Electrical and Complete
e iciency and performance, the
be because the internal areas don't meet the
Lighting Services (CLS),
new lights contain Tridonic's
needs of the current occupiers.
were tasked
proven LLE 24x560mm 1300lm
Additionally, improvements in
with delivering
ADV 5 linear LED board along
understanding of the importance
the architects
with the associated LCA
of light, and technological
vision of new
50w one4all driver. These
advancements in delivery and
feature lighting
components deliver high
management of light levels mean
that would
colour consistency and flexible
that when a refurbishment is
resemble suspended planting. Daniel
configuration as well as a minimum of 72,000 hours of
planned, reviewing and refreshing
Pritchard, Contracts Manager, LSR
light with Tridonic's five-year guarantee, negating the
the lighting is key. One such site is
Electrical explains: "We have a longstanding
need for regular maintenance.
One London Wall Place; designed by
relationship with CLS lighting
"The new lighting provides a real feature to a once
Foster & Partners and constructed in
so approached them to come up with a
empty space and draws people in, it has improved
2003 to provide 200,000 2 of o ice
custom-built solution."
the environment and provides consistent and correct
accommodation.
CLS had to consider not only the
lighting levels;" commented Pritchard.
Having refurbished three
height of the reception area but also
So, whilst London o ices may not be as busy as they
upper floors, Collins Construction was tasked with
the high light level output required. Rob Davies, CLS,
used to be, those currently using One London Wall
rejuvenating the ground and first floor reception areas.
said: "Our design features 10 bespoke luminaires.
Place, or planning to return, are assured of a bright
The double height entrance space lacked inspiration
Fabricated from steel, each measures 1.5m square, is
welcome.
www.tridonic.com Simon.Blazey@tridonic.com
link
/
link
/www.tridonic.com
link