MONTH IN FM 
 NOVEMBER 2019    55 
 FMJ.CO.UK 
 GRADUS WALL PROTECTION FUTURE-PROOFS  
 PRESTIGIOUS CANCER TREATMENT CENTRE    
 Contract interior specialist Gradus has supplied  
 and installed a range of bespoke wall protection  
 solutions at The Christie NHS Foundation  
 Trust’s ground-breaking new Proton Beam  
 Therapy (PBT) Centre, providing it with invisible  
 protection to future-proof it against everyday  
 damage for years to come. 
 The Wall Protection products have been fitted  
 throughout the state-of-the-art £125m centre in  
 Manchester, the first facility to o er high-energy NHS  
 proton beam therapy in the UK. They were provided  
 as part of Gradus’s supply-and-fit service, which  
 sees the company work closely with its customers  
 to design, manufacture and install the best possible  
 solution for their needs. 
 The Christie was seeking a solution that would  
 provide it with all the benefits of wall protection  
 in terms of reducing lifecycle costs, while being  
 as ‘invisible’ as  
 possible, creating  
 a less institutional  
 and more relaxing  
 environment for its  
 patients. To make  
 this vision a reality,  
 Gradus worked  
 closely with the  
 hospital throughout  
 the process. 
 In cooperation  
 with The Christie and  
 the centre’s main  
 building contractor,  
 Gradus supplied  
 and installed its  
 SureProtect Pure  
 hygienic wall cladding in White and  
 Iceberg shades. Specially designed  
 to create an impermeable barrier to  
 moisture and bacteria, SureProtect  
 Pure is the perfect solution for  
 healthcare environments. Its smooth,  
 easy-to-clean surface makes it  
 especially hygienic and ensures  
 it meets ‘Health Building Note  
 00-09: Infection control in the built  
 environment’. 
 In various areas of the five-storey  
 site, Gradus also fitted a range of other  
 Wall Protection products: full-height  
 90° Corner Guards to protect vulnerable corners;  
 200mm Wall Guards to protect the walls; and Bed  
 Head Protectors behind the beds to protect the  
 vital medical equipment used to support patients.  
 All were supplied in Alum or Chalk colours to blend  
 into the background and complement the overall  
 design of the facility, ensuring a well-protected and  
 aesthetically pleasing building. 
 In addition, in areas that will be used by  
 potentially vulnerable patients, Gradus installed  
 its Combination Rails – handrails that combine  
 with wall guard elements to o er both support  
 and protection. In line with BS 8300-2:2018  
 and Approved Document M, the handrails were  
 supplied in Shale colour to o er a 30 points LRV  
 di erence from the wall to which it is attached,  
 ensuring suitable contrast for support and  
 direction. 
 “The Christie were extremely pleased with the  
 solutions we installed for them, and the way that  
 some blend in with the environment while others  
 stand out for better inclusivity,” comments Chris  
 Jackson, Wall Protection Sales Manager at Gradus.  
 “Having worked with The Christie before, we  
 were thrilled to continue our relationship on this  
 prestigious and rigorous ProCure 21+ project, which  
 will mean that cancer patients can benefit from  
 advanced treatment today, tomorrow and well into  
 the future. 
 “The project was an excellent example of our  
 supply-and-fit service, showing how we work closely  
 with clients and supply chain partners to deliver the  
 project on time and exactly to specification.” 
 For more information on Gradus’s supply-and-fit  
 service for wall protection, or to request a hard copy  
 of the company’s new wall protection brochure,  
 please contact Gradus Technical Support on 01625  
 428922 or visit www.gradus.com. 
   www.gradus.com                      01625 428922 
 
				
/www.gradus.com
		/www.gradus.com